Storage tanks
API 650 and NBR 7821 atmospheric tanks, from bottom and shell plates to the roof.

Failed tests, rework and weld repairs are expensive and delay delivery. We apply Ishikawa, Pareto, 5 Whys and 5W2H right at the assembly front to find the real cause of defects and remove it, with traceable records in the databook.
The four tools work in sequence. The example below follows a real job: the field erection of an API 650 storage tank.
Find the root of the problem
Also called the fishbone or cause-and-effect diagram. It sorts every possible cause of a defect into six families (6M), so the team does not jump straight to the first suspect.
Welder not qualified (WPQ) for the vertical position
Low-hydrogen electrodes left out of the oven, picking up moisture
WPS parameters not followed at the work front
Loose ground clamp and power source with unstable current
Clamp ammeter out of calibration
Wind and humidity on site with no protective screen
Decide which problems to solve first
Ranks defects from most to least frequent and shows the cumulative percentage. A few causes usually account for most of the rejections (the 80/20 rule).
Porosity, lack of fusion and undercut add up to 76% of the rejections. Tackling those three causes removes most of the rework.
| Defect | Share | Cumulative |
|---|---|---|
| Porosity | 38% | 38% |
| Lack of fusion | 24% | 62% |
| Undercut | 14% | 76% |
| Slag inclusion | 10% | 86% |
| Crack | 6% | 92% |
| Misalignment | 5% | 97% |
| Spatter | 3% | 100% |
Understand what caused the problem
Asks "why?" in sequence until it moves past the symptom to a process cause that can be removed. It avoids fixing only the effect, such as repairing the weld without stopping the defect from coming back.
Problem: rejection for lack of fusion in the bottom joint
Root cause: a failure in the documentation system, not in the welder
Build an action plan to solve the problem
Turns the root cause into a clear action plan: each action has an owner, deadline, place, method and cost, so it can be followed up and checked.
API 650 and NBR 7821 atmospheric tanks, from bottom and shell plates to the roof.
ASME Section VIII and NR-13 equipment, with material and welder traceability.
ASME B31.3 spools and lines, with joint control by isometric.
AWS D1.1 structures, from walkways and supports to equipment bases.
Send us the reports or describe the problem. Our engineers will tell you where to start the analysis and which tool fits your case.